Gansu test project
2018-04-16 | 點擊次數:7234
In Gansu test base, the area of the mirror frame is 150 square meters,
and the construction is completed in December 2017 ;
the system test is carried out to provide the basis for the improvement of the structure, transmission system, control system and software system.